(a) If a pneumatic tightness test is performed on piping pursuant to Env-Or 406.05(b)(2), the test shall be conducted as follows:
- (1) Pressurize flexible secondary containment piping at 5 psi and maintain the pressure for a minimum of 10 minutes;
- (2) Pressurize nonflexible secondary containment piping at 10 psi and maintain the pressure for a minimum of 10 minutes;
- (3) Apply soap solution to all piping joints and other connections; and
- (4) Observe the joints and connections for leaks for the duration of the test.
- (b) The piping shall be backfilled only if no leaks are observed for the duration of the test.
- (c) All installed secondary containment piping shall be pressurized for a minimum period of 2 hours after the backfill process has been completed.
- (d) Test results shall be provided to the department at the final site inspection required by Env-Or 407.07(e).
- (e) The certified tank installer shall remove all testing equipment after the test is completed.
- (f) Each test gauge used for pneumatic tightness testing shall have an operating range that conforms to the requirements of the test method being used.
Source. (See Revision Note #1 at chapter heading for Env-Or 400) #10393, eff 9-1-13; ss by #12643, eff 10-10-18 (formerly Env-Or 406.23) (See Revision Note #2 at chapter heading for Env-Or 400)