- (a) The owner of a UST system shall test all leak monitoring equipment annually for proper operation.
- (b) The owner of a UST system containment sump having a sensor or discriminating sensor system which automatically de-energizes the specific dispensing pump or submersible tank pump when regulated substance is detected and that is not being tightness tested triennially pursuant to the requirements of Env-Or 406.14(b) shall test each system for proper operation no later than October 12, 2021 and annually thereafter.
- (c) The owner of a UST system that includes a day tank that is automatically filled from the UST shall test the rupture basin or secondary containment leak monitoring equipment no later than October 12, 2021 and annually thereafter.
- (d) The owner shall submit to the department no later than 30 days after the date of the test the leak monitor test information specified in (e), below, in a report generated by the owner, on a form available from the department, or on any other document containing the required information.
(e) The leak monitor test report shall include the following:
- (1) The information required by Env-Or 406.07(c)(1)-(6);
- (2) Leak monitor model number and manufacturer’s name;
- (3) Verification that the leak monitor console assignments are correctly programmed and labeled for all sensors;
- (4) Verification that the tank and piping sensors for the secondary containment is positioned in accordance with the manufacturer’s requirements;
- (5) Verification that the brine level of the tank interstitial space is within the manufacturer’s operating range;
- (6) Verification that the secondary containment is free of debris, water, and regulated substance;
- (7) Verification that all sensors were visually inspected and confirmed operational by manually simulating an alarm condition;
- (8) Verification that all leak monitor console audible alarms are operational;
- (9) Verification that all leak monitor console visual alarms are operational;
- (10) Verification that the communication system, such as a modem, is operational for leak monitoring systems and will relay alarms to a remote station;
- (11) Verification that all secondary containment is continuously monitored; and
- (12) Verification that all associated product pump circuits have been de-energized, if applicable pursuant to the requirements of (b), above.
- (f) The testing technician who conducts the test shall sign the test report in accordance with Env-Or 406.07(e).
- (g) The testing technician shall attach to the submitted test report the information necessary to verify that this information is correct.
Source. (See Revision Note #1 at chapter heading for Env-Or 400) #10393, eff 9-1-13; ss by #12643, eff 10-10-18 (formerly Env-Or 406.20) (See Revision Note #2 at chapter heading for Env-Or 400)