(a) The owner shall test:
- (1) Sacrificial anode systems within 6 months of installation and every 3 years thereafter; and
- (2) Impressed current systems within 6 months of installation and every 3 years thereafter.
- (b) The individual conducting the testing shall be a cathodic protection tester.
(c) The owner shall submit the following information in a report of the cathodic protection test generated by the owner, on a form made available by the department, or any other document:
- (1) The information required by Env-Or 406.07(c)(1)-(6);
- (2) A description of the equipment used to conduct the test;
- (3) Test locations;
- (4) Test results;
- (5) For impressed current systems, the specified rectifier DC output range in volts and amps; and
- (6) The tester’s International Code Council, Steel Tank Institute, or NACE certification number.
- (d) The cathodic protection tester who has conducted the test shall sign the test report in accordance with Env-Or 406.07(e).
- (e) When a cathodic protection test is performed, the owner shall send the test report to the department no later than 30 days after the date of the test.
Source. (See Revision Note #1 at chapter heading for Env-Or 400) #10393, eff 9-1-13; ss by #12643, eff 10-10-18 (formerly Env-Or 406.17) (See Revision Note #2 at chapter heading for Env-Or 400)