- (a) The owner shall notify the department to arrange for an inspection prior to introducing oil into a newly constructed AST system and prior to backfilling an underground piping system.
(b) The department shall grant approval to operate the new AST system only if the department:
- (1) Determines that the newly-constructed AST system or piping system has been installed in accordance with the approved plans and the terms and conditions of the approval issued pursuant to Env-Or 307.05; and
- (2) Receives the report from the certified installation supervisor as required by Env-Or 307.09.
Source. (See Revision Note at chapter heading for Env-Or 300) #10487, eff 2-7-14; ss by #14094, eff 10-4-24