N.H. Code Admin. R. Env-Hw 510.05
Rail or Water Shipments
Effective Aug 1, 2025#5053, eff 1-24-91; ss by #5886, eff 8-26-94; ss by #7333, eff 8-1-00; ss by #9215, INTERIM, eff 8-1-08; ss by #9367, eff 1-28-09; ss by #12347, eff 8-14-17; ss by #12922, eff 11-23-19; ss by #14280, eff 8-1-25, EXPIRES: 8-1-35Hazardous Waste Programs
- (a) For bulk shipments of hazardous waste that occur solely by water and for rail shipments of hazardous waste that originate at the site of generation, the generator shall comply with this section instead of with Env-Hw 510.02(a)(5), (a)(6), (b)(5), (b)(6), and (c)(3), as applicable.
(b) For bulk shipments of hazardous waste that occur solely by water, if waste is to be shipped using a paper manifest, the generator shall, within 5 days of shipment, send:
- (1) To the owner or operator of the designated facility, or to the last water transporter to handle the waste in the United States if exported by water, 3 copies of the dated and signed manifest;
- (2) To the department, one copy of the dated and signed manifest; and
- (3) To the destination state, one copy of the dated and signed manifest if the shipment remains within the United States and the destination state requires a copy.
(c) For rail shipments of hazardous waste that originate at the site of generation, if waste is to be shipped using a paper manifest, the generator shall, within 5 days of shipment, send:
(1) To the following, 3 copies of the dated and signed manifest:
- a. The next non-rail transporter, if any;
- b. The designated facility if transported solely by rail; or
- c. The last rail transporter to handle the waste in the United States if exported by rail;
- (2) To the department, one copy of the dated and signed manifest; and
- (3) To the destination state, one copy of the dated and signed manifest if the shipment remains within the United States and the destination state requires a copy.
(d) For bulk shipments of hazardous waste that occur solely by water and for rail shipments of hazardous waste that originate at the site of generation, if waste is to be shipped using an electronic manifest that has been printed for a generator’s signature, the generator shall, within 5 days of shipment, send:
- (1) To the department, one copy of the dated and signed manifest; and
- (2) To the destination state, one copy of the dated and signed manifest if the shipment remains within the United States and the destination state requires a copy.
Source. #5053, eff 1-24-91; ss by #5886, eff 8-26-94; ss by #7333, eff 8-1-00; ss by #9215, INTERIM, eff 8-1-08; ss by #9367, eff 1-28-09; ss by #12347, eff 8-14-17; ss by #12922, eff 11-23-19; ss by #14280, eff 8-1-25, EXPIRES: 8-1-35