N.H. Code Admin. R. Env-Hw 504.04
Notification Requirements for a Temporary EPA Identification Number
Effective Aug 1, 2025#5053, eff 1-24-91; ss by #5886, eff 8-26-94; ss by #7333, eff 8-1-00; ss by #9215, INTERIM, eff 8-1-08; ss by #9367, eff 1-28-09; ss by #12347, eff 8-14-17 (formerly Env-Hw 505.03); ss by #12922, eff 11-23-19; ss by #14280, eff 8-1-25, EXPIRES: 8-1-35Hazardous Waste Programs
- (a) A generator of hazardous waste that is required to manifest hazardous waste due to a one-time, non-recurrent, temporary activity that is not related to normal production processes shall obtain a temporary EPA identification number.
(b) An activity eligible for a temporary EPA identification number shall include, but not be limited to, removal of:
- (1) Off-specification materials from a site that normally does not otherwise generate hazardous waste;
- (2) Underground storage tanks; and
- (3) Contaminated soil due to a spill at a site that normally does not otherwise generate hazardous waste.
(c) A generator shall request a temporary EPA identification number by providing to the department, orally or in writing, the following information:
- (1) Site’s legal name and mailing address;
- (2) Street address where the waste is being generated;
- (3) Contact person, title, telephone number, and if available, email address; and
- (4) Waste description, all applicable EPA and NH hazardous waste numbers, and estimated amount to be transported.
- (d) The department shall assign a temporary EPA identification number if the activity meets the provisions specified in (a) and (b), above, and the generator provides all of the information specified in (c), above.
(e) A temporary EPA identification number shall be valid for no longer than 30 days unless the generator has requested and the department has granted an extension of the 30-day period, as follows:
- (1) A generator that wishes to obtain an extension of the time allowed for onsite accumulation of hazardous waste shall submit a written request for an extension that explains the circumstances warranting such an extension;
- (2) The department shall grant the requested extension if the generator demonstrates that the waste cannot be removed within 30 days due to temporary, unforeseen, or uncontrollable circumstances.
- (f) While hazardous waste activities are occurring at a site that is eligible for a temporary EPA identification number, the generator shall comply with the independent requirements and conditions for exemption applicable to its generator category, except for Env-Hw 509.04 and Env-Hw 514, as applicable.
Source. #5053, eff 1-24-91; ss by #5886, eff 8-26-94; ss by #7333, eff 8-1-00; ss by #9215, INTERIM, eff 8-1-08; ss by #9367, eff 1-28-09; ss by #12347, eff 8-14-17 (formerly Env-Hw 505.03); ss by #12922, eff 11-23-19; ss by #14280, eff 8-1-25, EXPIRES: 8-1-35