(a) A person seeking approval pursuant to Env-Dw 305.04(a) shall submit a preliminary report to the department that contains the following:
- (1) The cover page specified in Env-Dw 305.06, which has been signed as specified in Env-Dw 305.07; and
- (2) The information and maps specified in Env-Dw 305.08.
(b) All work conducted to fulfill the requirements of Env-Dw 305 shall be completed by, or under the supervision of, an individual who is:
- (1) Qualified by training and experience to complete the work required by Env-Dw 305; and
(2) At least one of the following, as applicable based on the specific work being performed:
- a. A professional geologist (P.G.) licensed to work in New Hampshire pursuant to RSA 310-A;
- b. A professional engineer (P.E.) licensed to work in New Hampshire pursuant to RSA 310-A;
- c. A water system operator licensed in New Hampshire pursuant to RSA 332-E;
- d. A water well contractor licensed in New Hampshire pursuant to RSA 482-B; or
- e. A pump installer licensed in New Hampshire pursuant to RSA 482-B.
(c) The preliminary report submitted pursuant to (a), above, shall be:
- (1) Signed and dated by the individual who completed or supervised the work as required by (b), above, and if the individual is a P.G. or P.E., stamped or sealed by the individual; and
- (2) Filed electronically in a portable document format.
- (c) The department shall review the preliminary report as specified in Env-Dw 305.16.
- (d) If the department approves the preliminary report and the applicant wishes to continue, the applicant shall proceed as specified in Env-Dw 305.18.
Source. (See Revision Note #1 at part heading for Env-Dw 305) #9007, eff 10-19-07, ss by #11062, eff 4-1-16 (See Revision Note #2 at part heading for Env-Dw 305)