- (a) The certified operator representing the PWS shall notify the department in accordance with (b) and (c), below, no later than 2 business days after any bulk water is delivered to customers.
(b) The notice provided pursuant to (a), above, shall contain the following information:
- (1) The name and PWS identifier;
- (2) The name of the city or town in which the PWS is located;
- (3) The date and time of each bulk water delivery;
- (4) The name and certification number of the certified operator accepting delivery of the bulk water on behalf of the PWS;
- (5) The reason(s) for delivery;
- (6) The source of the water delivered;
- (7) The total amount of water delivered;
- (8) The name and contact information of the person providing the bulk water;
- (9) The name and contact information of the individual driver delivering the bulk water;
- (10) The type of truck used to transport the water;
- (11) The type of connections used to transfer the water;
- (12) What measures were taken to avoid contamination during transfer;
- (13) Location of the physical connection of the fill pipe to the PWS distribution system;
- (14) The analytical results for the bulk water provided pursuant to Env-Dw 304.07(b);
- (15) Description of tank inspections and cleaning and disinfection methods used; and
- (16) If applicable, the reason(s) why the PWS might need additional deliveries.
- (c) The individual who completes the notice required by (a) and (b), above, shall sign and date the notice.
- (d) Community water systems shall notify customers of any bulk water delivered in the consumer confidence report prepared pursuant to Env-Dw 811.
Source. #9577, eff 10-23-09; ss by #12444, eff 1-1-18