In order to be eligible for financial assistance from the DWSRF, infrastructure projects also shall:
- (a) Comply with applicable federal requirements;
- (b) Comply with applicable state design criteria as specified in Env-Dw 400;
(c) For water supply treatment, distribution, or storage projects, meet eligible design capacity as determined in accordance with the following:
- (1) The eligible design capacity shall be based on average daily flow and peak flows in accordance with population and per capita flow figures;
- (2) Eligible design capacity for treatment facilities shall be based on a period of 20 years from the estimated date of initiation of operation; and
- (3) Eligible design capacity for water distribution mains and intake or raw water mains shall be based on 40 years from the estimated date of initiation of operation;
- (d) If a distribution system, consist of the common lines of the water system that distribute water directly from source or treatment facilities; and
- (e) Meet any other requirements specified in the applicable capitalization grant.
Source. (See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff 1-20-21