- (a) “Construction” means “construction” as defined in RSA 486-A:2, I, as reprinted in Appendix B.
- (b) “Eligible groundwater investigation costs” means “eligible evaluation of the groundwater contribution area of public wells that have recorded levels of chemical contaminants excluding MTBE” as defined by RSA 486-A:2, III-c, as reprinted in Appendix B.
- (c) “Eligible regional water systems costs” means “eligible regional water system costs” as defined by RSA 486-A:2, III-b, as reprinted in Appendix B.
- (d) “Eligible surface water treatment costs” means “eligible surface water treatment costs” as defined in RSA 486-A:2, III, as reprinted in Appendix B.
- (e) “U.S. Environmental Protection Agency” “EPA” means “EPA” as defined in RSA 486-A:2, IV, as reprinted in Appendix B.
- (f) “Expenditure” means payment to contractors and suppliers for eligible construction, material, and equipment costs incurred for eligible activities.
- (g) “Fixture rate” means the method of billing in the drinking water utility field where the method of billing for water service is based on a tabulation of water use fixtures rather than metering and each fixture is assigned a weighting factor which recognizes frequency and volume of anticipated use.
- (h) “Groundwaters” means “groundwaters” as defined in RSA 486-A:2, V-b, as reprinted in Appendix B.
- (i) “Method detection limit (MDL)” means the minimum concentration of a substance that can be measured and reported with 99 percent (%) confidence that the concentration is above zero.
- (j) “Regional water system” means “regional water system” as defined in RSA 486-A:2, V-a, as reprinted in Appendix B.
Source. (See Revision Note at chapter heading for Env-Ws 300) #6521, eff 6-4-97; ss by #8360, INTERIM, eff 6-4-05; ss by #8479, eff 11-30-05 (see Revision Note at part heading for Env-Dw 1001) (formerly Env-Ws 393.02); ss by #10616, eff 6-1-14; ss by #14121, eff 11-23-24, EXPIRES: 11-23-34