Recordkeeping and reporting requirements for CE testing shall be as follows:
- (a) The owner or operator of a source required to perform CE tests shall maintain a copy of the CE test results at the source;
- (b) The owner or operator shall notify the department at least 30 days prior to performing any CE or control efficiency tests;
- (c) The owner or operator shall report all results of CE testing to the department within 60 days of the test date;
- (d) For any source using a PTE, the owner or operator shall demonstrate by submitting written documentation to the department that the enclosure meets the requirements specified in Method 204 for a PTE during any testing of the control device;
(e) For any source using a TTE, the owner or operator shall demonstrate by submitting written documentation to the department that:
- (1) Its TTE meets the requirements given in Method 204 for a TTE during testing of their control device; and
- (2) The quality assurance criteria for a TTE have been achieved; and
- (f) The owner or operator shall notify the department of any changes made to the capture or control equipment, except for any reductions in the air flow at a collection point that occurs because the emission source that the collection point is serving is not being used.
Source. #7788, eff 10-31-02; ss by #9802, eff 10-31-10; ss by #12762, eff 5-1-19