Inspections pursuant to Env-A 3510.01 shall include the following:
- (a) Inspection of all burners, pilot assemblies, and pilot sensing devices for proper operation;
- (b) Proper adjustment of primary and secondary chamber combustion air flow;
- (c) Inspection of hinges and door latches;
- (d) Inspection of dampers, fans, and blowers for proper operation;
- (e) Inspection of HMIWI door and door gaskets for proper sealing;
- (f) Inspection of motors for proper operation;
- (g) Inspection of primary chamber refractory lining;
- (h) Inspection of incinerator shell for corrosion and hot spots;
- (i) Inspection of secondary/tertiary chamber and stack;
- (j) Inspection of mechanical loader, including limit switches, for proper operation, if applicable;
- (k) Visual inspection of waste bed grates;
- (l) For the burn cycle that follows the inspection, documentation that the incinerator is operating properly and that any necessary adjustments have been made;
- (m) Inspection of air pollution control device or devices for proper operation, if applicable;
- (n) Inspection of waste heat boiler systems to ensure proper operation, if applicable;
- (o) Inspection of bypass stack components;
- (p) Proper calibration of thermocouples, sorbent feed systems and any other monitoring equipment; and
- (q) General observation that the equipment is maintained in good operating condition.
Source. #8788, eff 1-5-07