A large MWC facility combusting PWR shall obtain PWR only from suppliers that contract with independent third parties to conduct inspections of their facilities that meet the following requirements:
- (a) Inspections shall be unannounced;
(b) An inspector shall:
- (1) Perform an onsite inspection of the supplier’s operations that affect the production of PWR to determine whether processing complies with the requirements of 40 CFR 241.4(a)(5);
- (2) Collect a composite sample that consists of at least 8 discrete samples from PWR that is on site at the time of the inspection;
- (3) Analyze the composite sample in accordance with Env-A 3308.06 to determine whether the PWR meets the criteria specified in Env-A 3308.03;
- (4) Prepare a written inspection report containing the final results of the inspection and composite sample analysis; and
- (5) Within 45 days after completion of the inspection, provide the written inspection report to the large MWC facility combusting or proposing to combust PWR from the supplier.
Source. #12628, eff 9-27-18