(a) The owner or operator shall provide the following:
- (1) Notification to the department, and as specified in Env-A 1806.03 and Env-A 1806.04, for each major asbestos abatement;
- (2) If the asbestos abatement is being done as part of a demolition, an “Asbestos Demolition Notification” form, as required by Env-A 1806.05; and
- (3) An “Asbestos Transport for Disposal Notification” form for the transport for disposal as required by Env-A 1806.07.
- (b) The owner or operator shall create a work plan containing engineering controls and work practices necessary to comply with all applicable asbestos requirements.
- (c) Upon request by the department, the owner or operator shall submit by mail, hand delivery, or electronic means to the department, within 3 business days of the request, a copy of the work plan for each asbestos abatement conducted.
Source. (See Revision Note #1, Revision Note #2, and Revision Note #3 at chapter heading for Env-A 1800) #14104, eff 11-1-24, EXPIRES: 11-1-34