- (a) In accordance with 40 CFR §93.125(c), prior to making a project-level conformity determination for a transportation project, the FHWA or FTA shall obtain from the project sponsor or operator a written commitment, as defined in 40 CFR §93.101, to implement any project-level mitigation or control measure in the construction or operation of the project identified as a condition for NEPA process completion.
- (b) Prior to making a conformity determination for a metropolitan transportation plan or TIP, the MPO shall ensure that any project-level mitigation or control measures for which a written commitment has been made are included in the project design concept and scope and are appropriately identified in the regional emissions analysis used in the conformity analysis.
- (c) Written commitments shall be obtained before such mitigation or control measures are used in a project-level hot-spot conformity analysis for a project-level determination.
Source. (See Revision Note at chapter heading for Env-A 1500) #9999, eff 10-1-11; ss by #12975, eff 1-18-20