(a) When an operator marks its underground facility, it shall indicate:
- (1) The width of the underground facility for all facilities greater than 1 inch nominal diameter;
- (2) The specific owner or operator of the underground facility; and
- (3) The function of the underground facility.
(b) For purposes of En 806.03(a)(3) functions shall be marked by using:
- (1) The letter "E" for underground facilities conveying electricity;
- (2) The letter "G" for underground facilities conveying gas;
- (3) The letters "PP" for underground facilities conveying oil;
- (4) The letters "ST" for underground facilities conveying steam;
- (5) The letters "CH" for underground facilities conveying chemicals;
- (6) The letter "T" for underground facilities containing telephone wires or cable;
- (7) The letters "CATV" for underground facilities conveying cable television signals;
- (8) The letters "TC" for underground facilities conveying traffic control information or signals;
- (9) The letters "FA" for underground facilities conveying fire alarm information or signals;
- (10) The letter "W" for underground facilities conveying water;
- (11) The letters "RW" for underground facilities conveying reclaimed water;
- (12) The letter "S" for underground facilities conveying sewage;
- (13) The letters "SS" for underground facilities conveying storm sewage; and
- (14) The letters "SD" shall be used for underground facilities used for storm drainage.
- (c) An operator shall identify with markings any changes in direction or terminations occurring within the immediate area of the proposed excavation with arrows or other appropriate indicators.
Source. #14062, eff 8-21-24