- (a) Each utility shall file department "Form E-24, Report of Gas Meter Complaint Tests," dated October 2023 monthly with the department.
(b) Form E-24 shall include the following:
- (1) The name of the utility filing the report;
- (2) The name and address of the customer making the complaint;
- (3) The meter manufacturer; manufacturer's number; company number; type and size of meter;
- (4) The percent registrations which are fast or slow;
- (5) The period of refund or collection; and
- (6) The signature, full name, and title of the utility employee who supervised the preparation of the report, and date of signature.
Source. #13796, eff 10-25-23