- (a) In addition to other requirements set by rule, statute, or other law, each registered service technician shall complete and submit “Placed in Service/Inspection Report Form RPP/TC-10-02 (Rev. 07/14)” to the department.
(b) A registered service technician shall furnish the following on “Placed in Service/Inspection Report Form RPP/TC-10-02 (Rev. 07/14)”:
- (1) Name of business;
- (2) Full address, including city, state, and zip code;
(3) The following information about each refined petroleum products device at the business:
- a. Whether installed;
- b. Whether repaired;
- c. Whether tested and calibrated for device license;
- d. Make of meter;
- e. Serial number of meter;
- f. Model number of meter;
- g. Size;
- h. Make of register;
- i. Minimum and maximum marked discharge rates;
- j. Meter location;
- k. Product;
- l. Identify all accessories;
- m. Start and finishing totalizer readings; and
- n. Tolerance applied;
(4) The following information about each test data:
- a. Type of test;
- b. Actual discharge rate;
- c. Totalizer reading start; and
- d. Totalizer reading finish;
(5) The following information about each prover data:
- a. Prover temperature;
- b. Prover reading;
- c. Correction for expansion/contraction of prover;
- d. Volume correction for prover reading; and
- e. Prover reading corrected to 60 degrees Fahrenheit;
(6) The following information about each meter data:
- a. Gross meter reading; and
- b. Net meter reading;
(7) If an uncompensated run or systems that give both gross and net readings, the following:
- a. Average meter temperature;
- b. Volume correction for meter reading; and
- c. Meter reading corrected to 60 degrees Fahrenheit;
- (8) Net delivery error; and
- (9) Correct gross delivery error.
Source. (See Revision Notes #1 and #2 at chapter heading for Agr 1400) #12424, eff 12-1-17