N.D. Admin. Code § 89-08-02-01
89-08-02-01. Determining if a permit is required.
1. The impounding capacity of a dam is calculated based upon the elevation at the top of dam. Storage below the existing adjacent ground surface is generally excluded from the capacity of a holding pond, lagoon, or dugout.
2. The area protected by a dike is calculated based upon the area protected as measured from the effective top of dike.
3. The diverting capacity of a diversion is calculated based upon the runoff from the National Oceanic and Atmospheric Administration Atlas 14 twenty-five year, twenty-four hour, precipitation event.
4. No construction can begin until a construction permit is obtained.
History: Effective November 1, 1989; amended effective April 1, 2004; January 1, 2015; January 1, 2023; July 1, 2024.
General Authority: NDCC 61-03-13
Law Implemented: NDCC 61-16.1-38