1. 1. Decommissioning the facility includes:
1. a. Dismantling and removal of all panel racking, photovoltaic modules, supports, anchors, towers, fencing, overhead cables, inverters, transformers, substations, and other equipment;
2. b. Removal of underground cables to a depth of twenty-four inches [60.96 centimeters];
3. c. Removal of pilings and anchors, foundations, buildings, and ancillary equipment to a depth of four feet [121.92 centimeters].
4. d. Site restoration and reclamation to the approximate original topography that existed prior to construction of the facility with topsoil respread over the disturbed areas at a depth similar to that in existence prior to the disturbance; and
5. e. Grading and restoring topsoil of areas disturbed by the facility, and reseeding according to natural resource conservation service recommendations.
2. 2. The commission may waive a decommissioning requirement upon receipt of a request signed by the applicable landowner and finding good cause that the requirement be waived.
History: Effective July 1, 2020.