N.D. Admin. Code § 69-06-02.1-02
69-06-02.1-02. Contents.
A request for a jurisdictional determination must contain:
1. A description of the size of the facility;
2. A description of the type of the facility;
3. A description of the area to be served;
4. A map of the study area for the proposed site or corridor;
5. A description of the ownership and operation responsibility of the facility;
6. A description of the facilities and equipment that will be used and how they will be maintained;
7. A description of the owner's or operator's plans for selling, transmitting, or distributing the output of the plant;
8. A description of how the facility will be physically and electronically interconnected with other energy conversion, transmission, and distribution facilities;
9. A description of the owner's and operator's economic evaluation of the facility; and
10. A description of how the site will be leased or other rights of access will be obtained.
History: Effective April 1, 2011.
General Authority: NDCC 49-22-18
Law Implemented: NDCC 49-22-07.1