N.D. Admin. Code § 43-02-02.2-50
Throughout the time when any control parameter is present in a monitoring well, a water sample must be taken at least two times a week from the well. The samples must be analyzed for all control parameters within one week after the sample is taken.
History: Effective January 1, 2009.
General Authority: NDCC 38-12-02
Law Implemented: NDCC 38-12-02