N.D. Admin. Code § 43-02-02.2-28
In determining the number, location, and construction of monitoring wells, and the frequency of sampling from monitoring wells, the following must be considered:
1. Whether any person relies on the underground source of drinking water affected or potentially affected by the injection operation;
2. The proximity of the injection operation to points of withdrawal of drinking water;
3. The local geology and hydrology;
4. The operating pressures and whether a negative pressure gradient is being maintained;
5. The toxicity and volume of the injected fluid, the formation water, and the process byproducts; and
6. The spatial distribution of the injection wells.
History: Effective January 1, 2009.
General Authority: NDCC 38-12-02
Law Implemented: NDCC 38-12-02