15A NCAC 13B .0839
(b) Applications shall include:
(4) testing methods and schedule to document Subparagraph (3) of this Paragraph.
If required by G.S. 89C, a professional engineer shall prepare these documents. [Note: The North Carolina Board of Examiners for Engineers and Surveyors has determined, via letter dated March 11, 2010, that preparation of engineering design documents for alternative treatment methods that do not fit the criteria outlined in this Section constitutes practicing engineering under G.S. 89C.]
(c) Innovative or alternative design criteria shall be approved in cases where the applicant can demonstrate that the alternative design criteria will provide the following:
History Note: Authority G.S. 130A-291.1;
Eff. April 1, 2010;
Readopted Eff. February 1, 2019 (Recodified from 15A NCAC 13B .0842).