15A NCAC 02T .0604
(b) Soils report. A soil evaluation of the disposal site shall be provided to the Division by the applicant in a report that includes the following. If required by G.S. 89F, a soil scientist shall prepare this evaluation:
(1) a field description of the soil profile, based on examinations of excavation pits and auger borings, within seven feet of land surface or to bedrock, describing the following parameters by individual diagnostic horizons:
(G) the presence or absence and depth of evidence of any seasonal high water table.
Applicants may be required to dig pits when necessary for proper evaluation of the soils at the site.
(4) a Standard Soil Fertility Analysis conducted on each land application site. The Standard Soil Fertility Analysis shall include the following parameters:
(N) zinc.
[Note: The North Carolina Board for Licensing of Soil Scientists has determined, via letter dated December 1, 2005, that preparation of soils reports pursuant to this Paragraph constitutes practicing soil science pursuant to G.S. 89F.]
(c) Engineering design documents. If required by G.S. 89C, a professional engineer shall prepare these documents. The following documents shall be provided to the Division by the applicant:
(3) engineering calculations, including hydraulic and pollutant loading for each treatment unit, treatment unit sizing criteria, hydraulic profile of the treatment system, total dynamic head, and system curve analysis for each pump, buoyancy calculations, and irrigation design.
[Note: The North Carolina Board of Examiners for Engineers and Surveyors has determined, via letter dated December 1, 2005, that preparation of engineering design documents pursuant to this Paragraph constitutes practicing engineering pursuant to G.S. 89C.]
(d) Site plans. If required by G.S. 89C, a professional land surveyor shall provide location information on boundaries and physical features not under the purview of other licensed professions. Site plans or maps shall be provided to the Division by the applicant depicting the location, orientation, and relationship of facility components including:
(1) a scaled map of the site, with topographic contour intervals not exceeding 10 feet or 25 percent of total site relief, showing:
(2) the location of each of the following that are located within 500 feet of a waste treatment, storage, or disposal site, including a delineation of their review and compliance boundaries:
(4) site property boundaries within 500 feet of all waste treatment, storage, and disposal sites.
[Note: The North Carolina Board of Examiners for Engineers and Surveyors has determined, via letter dated December 1, 2005, that locating boundaries and physical features, not under the purview of other licensed professions, on maps pursuant to this Paragraph constitutes practicing surveying pursuant to G.S. 89C.]
(e) Property Ownership Documentation shall be provided to the Division consisting of:
History Note: Authority G.S. 143‑215.1; 143‑215.3(a);
Eff. September 1, 2006;
Readopted Eff. September 1, 2018.