(a) General
- (1) There shall be no open burning of any material otherwise allowed under 15A NCAC 02D .1900.
- (2) The use of incinerators for the disposal of solid waste or liquid waste shall be prohibited.
- (3) Persons operating fuel-burning equipment which requires boiler lancing or soot blowing shall perform such operations only between noon and 4:00 p.m..
- (4) Persons operating motor vehicles should minimize their use through car pools and increased use of public transportation.
(b) Source Curtailment. Any person responsible for the operation of a source of air pollution shall take all required control actions for the warning level that are listed below:
(1) Operators of coal or oil fired electric power generating facilities shall:
- (A) use fuels having the lowest ash and sulfur content;
- (B) perform boiler lancing and soot blowing between noon to 4:00 p.m.; and
- (C) divert electric power generating to facilities outside of the warning area;
(2) Operators of coal or oil fired process steam generating facilities shall:
- (A) use fuels having the lowest ash and sulfur content;
- (B) perform boiler lancing and soot blowing between noon to 4:00 p.m.;
- (C) reduce steam load demands consistent with continuing plant operations; and
- (D) prepare to use the preplanned abatement program for emergency level;
(3) Operators of manufacturing industries of the following classifications: primary metal industries; petroleum refining and related industries; chemical and allied products industries; paper and allied products industries; glass, clay, and concrete products industries shall:
- (A) reduce air pollutants from manufacturing operations by, if necessary, assuming reasonable economic hardship by postponing production and related operations;
- (B) defer trade waste disposal operations that emit particles, gases, vapors, or malodorous substances;
- (C) reduce heat-load demands for processing consistent with continuing plant operations; and
- (D) perform boiler lancing or soot blowing between noon to 4:00 p.m.; and
- (4) Other persons requested by the Commission to prepare a preplanned abatement program shall take all required control actions for the warning level contained in their program plan.
History Note: Authority G.S. 143‑215.3(a)(1); 143‑215.3(a)(12);
Eff. February 1, 1976;
Amended Eff. July 1, 1984; December 1, 1976;
Readopted Eff. January 1, 2018.