15A NCAC 02B .0267
(See S.L. 2013-395)
Protection of the nutrient removal and other water quality benefits provided by riparian buffers throughout the watershed is an important element of the overall Jordan water supply nutrient strategy. The following is the strategy for riparian buffer protection and maintenance in the Jordan watershed, as prefaced in 15A NCAC 02B .0262:
(2) DEFINITIONS. For the purpose of this Rule, these terms shall be defined as follows:
(b) 'Airport Facilities' means all properties, facilities, buildings, structures, and activities that satisfy or otherwise fall within the scope of one or more of the definitions or uses of the words or phrases 'air navigation facility', 'airport', or 'airport protection privileges' under G.S. 63-1; the definition of 'aeronautical facilities' in G.S. 63-79(1); the phrase 'airport facilities' as used in G.S. 159-48(b)(1); the phrase 'aeronautical facilities' as defined in G.S. 159-81 and G.S. 159-97; and the phrase 'airport facilities and improvements' as used in Article V, Section 13, of the North Carolina Constitution, which shall include, without limitation, any and all of the following: airports, airport maintenance facilities, clear zones, drainage ditches, fields, hangars, landing lighting, airport and airport-related offices, parking facilities, related navigational and signal systems, runways, stormwater outfalls, terminals, terminal shops, and all appurtenant areas used or suitable for airport buildings or other airport facilities, and all appurtenant rights-of-way; restricted landing areas; any structures, mechanisms, lights, beacons, marks, communicating systems, or other instrumentalities or devices used or useful as an aid, or constituting an advantage or convenience to the safe taking off, navigation, and landing of aircraft, or the safe and efficient operation or maintenance of an airport or restricted landing area; easements through, or interests in, air space over land or water, interests in airport hazards outside the boundaries of airports or restricted landing areas, and other protection privileges, the acquisition or control of which is necessary to ensure safe approaches to the landing areas of airports and restricted landing areas, and the safe and efficient operation thereof and any combination of any or all of such facilities. Notwithstanding the foregoing, the following shall not be included in the definition of 'airport facilities':
(3) APPLICABILITY. This Rule applies to all landowners and other persons conducting activities in the Jordan watershed, including state and federal entities, and to all local governments in the Jordan watershed, as described in 15A NCAC 02B .0262. Local governments shall develop riparian buffer protection programs for approval by the Commission, incorporating the minimum standards set out throughout this Rule and shall apply the requirements of this Rule throughout their jurisdictions within the Jordan watershed except where The Division shall exercise jurisdiction. For the following types of buffer activities in the Jordan watershed, wherever local governments are referenced in this Rule, the Division shall implement applicable requirements to the exclusion of local governments:
(4) BUFFERS PROTECTED. The following minimum criteria shall be used for identifying regulated buffers:
(c) A surface water shall be subject to this Rule if the feature is approximately shown on any of the following references, and shall not be subject if it does not appear on any of these references:
(5) EXEMPTION BASED ON ON-SITE DETERMINATION. When a landowner or other affected party including the Division believes that the maps have inaccurately depicted surface waters, he or she shall consult the appropriate local government. Upon request, a local government representative who has successfully completed the Division's Surface Water Identification Training Certification course, its successor, or other equivalent training curriculum approved by the Division, shall make an on-site determination. Local governments may also accept the results of site assessments made by other parties who have successfully completed such training. Any disputes over on-site determinations shall be referred to the Director in writing. A determination of the Director as to the accuracy or application of the maps is subject to review as provided in Articles 3 and 4 of G.S. 150B. Surface waters that appear on the maps shall not be subject to this Rule if a site evaluation reveals any of the following cases:
(6) EXEMPTION WHEN EXISTING USES ARE PRESENT AND ONGOING. This Rule shall not apply to uses that are existing and ongoing; however, this Rule shall apply at the time an existing, ongoing use is changed to another use. Change of use shall involve the initiation of any activity that does not meet either of the following criteria for existing, ongoing activity:
(b) Projects or proposed development that are determined by the local government to meet at least one of the following criteria:
(7) ZONES OF THE RIPARIAN BUFFER. The protected riparian buffer shall have two zones as follows:
(a) Zone One shall consist of a vegetated area that is undisturbed except for uses provided for in Item (9) of this Rule. The location of Zone One shall be as follows:
(8) DIFFUSE FLOW REQUIREMENT. Diffuse flow of runoff shall be maintained in the riparian buffer by dispersing concentrated flow prior to its entry into the buffer and reestablishing vegetation as follows:
(9) TABLE OF USES. The following chart sets out potential new uses within the buffer, or outside the buffer with impacts on the buffer, and categorizes them as exempt, allowable, or allowable with mitigation. All uses not categorized as exempt, allowable, or allowable with mitigation are considered prohibited and may not proceed within the riparian buffer, or outside the buffer if the use would impact diffuse flow through the buffer, unless a variance is granted pursuant to Item (12) of this Rule. The requirements for each category are given in Item (10) of this Rule.
* To qualify for the designation indicated in the column header, an activity must adhere to the limitations defined for it in a given listing as well as the requirements established in Item (10) of this Rule.
1 Provided that:
· No heavy equipment is used in Zone One.
· Vegetation in undisturbed portions of the buffer is not compromised.
· Felled trees are removed by chain.
· No permanent felling of trees occurs in protected buffers or streams.
· Stumps are removed only by grinding.
· At the completion of the project the disturbed area is stabilized with native vegetation.
· Zones one and two meet the requirements of Sub-Items (7) and (8) of this Rule.
2 Provided that, in Zone One, all of the following BMPs for overhead utility lines are used. If all of these BMPs are not used, then the overhead utility lines shall require a no practical alternative evaluation by the local government, as defined in Item (11) of this Rule.
· A minimum zone of 10 feet wide immediately adjacent to the water body shall be managed such that only vegetation that poses a hazard or has the potential to grow tall enough to interfere with the line is removed.
· Woody vegetation shall be cleared by hand. No land grubbing or grading is allowed.
· Vegetative root systems shall be left intact to maintain the integrity of the soil. Stumps shall remain where trees are cut.
· Riprap shall not be used unless it is necessary to stabilize a tower.
· No fertilizer shall be used other than a one-time application to re-establish vegetation.
· Construction activities shall minimize the removal of woody vegetation, the extent of the disturbed area, and the time in which areas remain in a disturbed state.
· Active measures shall be taken after construction and during routine maintenance to ensure diffuse flow of stormwater through the buffer.
· In wetlands, mats shall be utilized to minimize soil disturbance.
3 Provided that poles or aerial infrastructure shall not be installed within 10 feet of a water body unless the local government completes a no practical alternative evaluation as defined in Item (11) of this Rule.
4 Provided that, in Zone One, all of the following BMPs for underground utility lines are used. If all of these BMPs are not used, then the underground utility line shall require a no practical alternative evaluation by the local government, as defined in Item (11) of this Rule.
· Woody vegetation shall be cleared by hand. No land grubbing or grading is allowed.
· Vegetative root systems shall be left intact to maintain the integrity of the soil. Stumps shall remain, except in the trench where trees are cut.
· Underground cables shall be installed by vibratory plow or trenching.
· The trench shall be backfilled with the excavated soil material immediately following cable installation.
· No fertilizer shall be used other than a one-time application to re-establish vegetation.
· Construction activities shall minimize the removal of woody vegetation, the extent of the disturbed area, and the time in which areas remain in a disturbed state.
· Measures shall be taken upon completion of construction and during routine maintenance to ensure diffuse flow of stormwater through the buffer.
· In wetlands, mats shall be utilized to minimize soil disturbance.
5 Perpendicular crossings are those that intersect the surface water at an angle between 75 degrees and 105 degrees.
(10) REQUIREMENTS FOR CATEGORIES OF USES. Uses designated in Item (9) of this Rule as exempt, allowable, and allowable with mitigation within a riparian buffer shall have the following requirements:
(11) DETERMINATION OF "NO PRACTICAL ALTERNATIVES."
(a) Persons who wish to undertake uses designated as allowable or allowable with mitigation shall submit a request for a "no practical alternatives" determination to the local government. The applicant shall certify that the project meets all the following criteria for finding "no practical alternatives":
(b) The applicant shall also submit at least the following information in support of their assertion of "no practical alternatives":
(c) Within 60 days of a submission that addresses Sub-Item (11)(b) of this Rule, the local government shall review the entire project and make a finding of fact as to whether the criteria in Sub-Item (11)(a) have been met. A finding of "no practical alternatives" shall result in issuance of an Authorization Certificate. Failure to act within 60 days shall be construed as a finding of "no practical alternatives" and an Authorization Certificate shall be issued to the applicant unless one of the following occurs:
(12) VARIANCES. Persons who wish to undertake prohibited uses may pursue a variance. The local government may grant minor variances. For major variances, local governments shall prepare preliminary findings and submit them to the Commission for approval. The variance request procedure shall be as follows:
(a) For any variance request, the local government shall make a finding of fact as to whether there are practical difficulties or unnecessary hardships that prevent compliance with the riparian buffer protection requirements. A finding of practical difficulties or unnecessary hardships shall require that the following conditions are met:
(13) MITIGATION. Persons who wish to undertake uses designated as allowable with mitigation shall meet the following requirements in order to proceed with their proposed use:
(14) REQUIREMENTS SPECIFIC TO FOREST HARVESTING. The following requirements shall apply for forest harvesting operations and practices:
(a) All the following measures shall apply in the entire riparian buffer as applicable:
(b) In Zone One, forest vegetation shall be protected and maintained. Selective harvest as provided for below is allowed on forest lands that have a deferment for use value under forestry in accordance with G.S. 105-277.2 through 277.6 or on forest lands that have a forest management plan. A plan drafted under either option shall meet the standards set out in this Item. Copies of either the approval of the deferment for use value under forestry or the forest management plan shall be produced upon request. For such forest lands, selective harvest is allowed in accordance with the following:
(c) In addition to the requirements of (b) in this Item, the following provisions for selective harvesting shall be met:
(15) RULE IMPLEMENTATION. This Rule shall be implemented as follows:
(b) Local governments shall continue to implement buffer programs approved by the Commission in September 2010 and January 2011, or subsequent revisions to those programs approved by the Commission or its delegated authority, to ensure that existing land use activities and proposed development complies with local programs. These programs are required to meet the standards set out in this Rule, 15A NCAC 02B .0268, and are guided by the model buffer program approved by the Commission in September 2009. A local government shall issue an approval for new development only if the development application proposes to avoid impacts to riparian buffers defined in Item (4) of this Rule, or where the application proposes to impact such buffers, it demonstrates that the applicant has done the following, as applicable:
(e) LOCAL OVERSIGHT. The Division shall periodically inspect local programs to ensure that they are being implemented and enforced in keeping with the requirements of this Rule. Local governments shall maintain on-site records for a minimum of five years, and shall furnish a copy of these records to the Division within 30 days of receipt of a written request for them. Local programs' records shall include the following:
History Note: Authority 143-214.1; 143-214.5; 143-214.7; 143-215.3(a)(1); 143-215.6A; 143-215.6B; 143-215.6C; 143 215.8B; 143B-282(c); 143B-282(d) S.L. 1999-329, s. 7.1.; S.L. 2005-190; S.L. 2006-259; S.L. 2009-216; S.L. 2009-484;
Eff. August 11, 2009;
Amended Eff. September 1, 2011;
See S.L. 2013-395;
Amended Eff. July 7, 2014.