(a) Fees for building permits except as otherwise specifically set out herein, are established as follows:
- (1) $ 250‑‑$1,500 cost $3.00 fee;
- (2) 1,500‑‑ 5,000 cost 3.50 fee;
- (3) 5,000‑‑10,000 cost 4.50 fee;
- (4) 10,000‑‑20,000 cost 6.50 fee;
- (5) 20,000‑‑40,000 cost 10.50 fee; and
- (6) 40,000‑‑ up cost 13.50 fee.
- (b) A fee of two dollars ($2.00) will be charged for permits and inspection of trailers, changes in electrical hot water heaters and electrical ranges and temporary electrical switches for construction purposes.
- (c) Additional inspections or inspection trips made necessary through fault of the contractor shall be deemed extra building inspections and a fee of three dollars ($3.00) shall be charged against and paid by the contractor.
- (d) No building permit shall be issued until the fee for the same shall have been paid.
History Note: Authority G.S. 122‑95; 143B‑10;
Eff. March 21, 1980;
Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. August 24, 2019.