04 NCAC 11 R08-69
(a) Definitions.
(b) Recovery of Costs.
(c) Utility Incentives.
(d) Special Provisions for Industrial or Large Commercial Customers.
(e) Annual Proceeding.
(f) Filing Requirements and Procedure.
(1) Each electric public utility shall submit to the Commission all of the following information and data in its application:
(ii) For each measure for which cost recovery is requested through the DSM/EE rider:
a. total expenses expected to be incurred during the rate period in the aggregate and broken down by type of expenditure, per appropriate capacity, energy and measure unit metric and the proposed jurisdictional allocation factors;
b. total costs that the utility does not expect to incur during the rate period as a direct result of the measure in the aggregate and broken down by type of cost, per appropriate capacity, energy and measure unit metric, and the proposed jurisdictional allocation factors, as well as any changes in the estimated future amounts since last filed with the Commission;
c. a description of the measurement and verification activities to be conducted during the rate period, including their estimated costs;
d. total expected summer and winter peak demand reduction per appropriate measure unit metric and in the aggregate;
e. total expected energy reduction in the aggregate and per appropriate measure unit metric.
(iii) For each measure for which cost recovery is requested through the DSM/EE EMF rider:
a. total expenses for the test period in the aggregate and broken down by type of expenditure, per appropriate capacity, energy and measure unit metric and the proposed jurisdictional allocation factors;
b. total costs that the utility did not incur for the test period as a direct result of the measure in the aggregate and broken down by type of cost, per appropriate capacity, energy and measure unit metric, and the proposed jurisdictional allocation factors, as well as any changes in the estimated future amounts since last filed with the Commission;
c. a description of, the results of, and the costs of all measurement and verification activities conducted in the test period;
d. total summer and winter peak demand reduction in the aggregate and per appropriate measure unit metric, as well as any changes in estimated future amounts since last filed with the Commission;
e. total energy reduction in the aggregate and per appropriate measure unit metric, as well as any changes in the estimated future amounts since last filed with the Commission;
f. a discussion of the findings and the results of the program or measure;
g. evaluations of event-based programs including the date, weather conditions, event trigger, number of customers notified and number of customers enrolled; and
h. a comparison of impact estimates presented in the measure application from the previous year, those used in reporting for previous measure years, and an explanation of significant differences in the impacts reported and those previously found or used.
(NCUC Docket No. E-100, Sub 113, 2/29/08; NCUC Docket No. E-100, Sub 113, 3/13/08; NCUC Docket No. E-100, Subs 113 & 121, 1/31/11; NCUC Docket No. E-100, Sub 160, 10/11/18.).