- (1) The contractor shall remove from the site all unused materials. Water pumped from the well shall be conducted to a place where it will be possible to dispose of the water without damage to property or the creation of a nuisance.
- (2) Cleanup and restoration of site should be covered by a drilling agreement.
- (3) The well shall be protected by the contractor from pollution during construction.
Authorizing statute(s): 37-43-202(3), MCA
Implementing statute(s): 37-43-202(3), MCA
History: NEW, 1986 MAR p. 1699, Eff. 10/17/86; AMD, 1997 MAR p. 65, Eff. 1/17/97.