2.1.1
Boilers and unfired pressure vessels to be installed for operation in Mississippi
2.1.2
be stamped Mississippi Standard
2.1.3
from the boiler to the first stop valve of a single boiler, and to the second stop
2.1.4
Mississippi Special -- If a boiler or pressure vessel is of special design or one that
2.1.5
Before secondhand equipment is installed, application for permission to install
2.1.6
shall be in accordance with ASME Code CSD-1, current edition, and its addenda
2.2.1
On and after the effective date of the rules and regulations first promulgated by
2.2.2
certificate inspection annually or as the Board may require and shall also be
2.2.3
Heating boilers shall receive a certificate inspection biennially
2.2.4
biennially
2.2.5
inspection biennially, but internal inspection shall not be required of pressure
2.2.6
Nuclear vessels within the scope of this chapter shall be inspected biennially and
2.2.7
inspections
2.3.1
Certificate inspections shall be in accordance with the frequency established by the
2.3.2
External inspections may be performed by inspector during reasonable hours and
2.3.3
When as a result of external inspection or determination by other objective means it
2.4.1
requirements shall be held at the office of the Board or at any other location to be
2.4.2
An applicant for an examination shall have education and experience equal to at
2.5.1
A fee of twenty-five dollars will be charged for each applicant taking the
2.6.1
Upon request, a certificate of competency and an identification card shall be
2.7.1
application fee of twenty-five dollars; or
2.7.2
that has a standard of examination substantially equal to that of Mississippi, or a
2.8.1
pressure vessels, or their appurtenances
2.9.1
regulations for power boilers and high pressure, high temperature water boilers
2.9.2
nonstandard boilers and pressure vessels shall be reported on a Standard Form for
2.9.3
thirty days from date of inspection
2.9.4
When hazardous conditions affecting the safety of a boiler or pressure vessel are
2.9.5
Owner-User Inspection Agencies may report subsequent inspections of both
2.10.1
All insurance companies shall notify the Chief Inspector, within thirty days, of all
2.11.1
pressure vessel, or any appurtenance thereof, is in such condition that his
2.11.2
unsafe for further operation, he shall promptly notify the owner or user, stating
2.12.1
Any person, firm, partnership or corporation operating pressure vessels in this
2.12.2
Such application and registration shall show the name of such agency and its
2.12.3
Each Owner-User Inspection Agency as required by the provisions of the Boiler
2.13.1
covering of the boiler or pressure vessel shall be removed to permit the inspector
2.14.1
When an accident occurs which serves to render a boiler or pressure vessel
2.15.1
conform to these Rules and Regulations, the owner or user shall pay directly to
2.15.2
When inspected by the State, an additional fee for the inspection service as
2.15.3
Fee Justification, Section 45-23-53 of the Act (“Boiler Pressure and Pressure
2.15.4
Fees Schedules of fees
2.15.5
Heating boilers
2.15.6
Pressure vessels:
2.15.7
Hydrostatic tests
2.15.8
All other inspections, including shop inspections, and inspections of secondhand
2.16.1
An inspection certificate, issued in accordance with the Act, shall be valid until
2.17.1
When the stamping on a boiler or pressure vessel becomes indistinct, the
2.18.1
that it is unsafe to operate, the inspector shall notify the Chief Inspector as
2.19.1
Any boiler or pressure vessel having been inspected and declared unsafe by the
2.19.2
Any person, firm, partnership, or corporation using or offering for sale a
2.20.1
another state for temporary use or repair, application shall be made by the owner
2.21.1
A nonstandard boiler or pressure vessel which is moved outside the boundaries of
2.22.1
Before a used or secondhand boiler or pressure vessel can be shipped for
2.23.1
When a stationary boiler or pressure vessel is moved and reinstalled, the attached
2.24.1
Any inspector may increase the factor of safety on any existing installation if the
2.24.2
user may appeal to the Board, which may request a joint inspection by the Chief
2.25.1
When major repairs or alterations are to be made by welding, they shall follow
2.26.1
shall be in accordance with the National Board Inspection Code, Chapter VI
2.27.1
No person shall attempt to remove or do any work on any safety appliance
2.27.2
No person shall load the safety valve or valves in any manner to maintain a
2.28.1
No boiler or pressure vessel shall hereafter be installed in this State unless it has
2.29.1
Upon completion of the installation of a new boiler or pressure vessel or at the