- (1) A minimum term of 4 months between December 1 and the following March 31 is the required duration of an easement, lease, or permit.
- (2) The easement, lease, or permit shall be in writing.
- (3) The department, when it deems it necessary for maintenance purposes, may provide for a longer term.
- (4) After the department has approved a trail, the applicant may submit a signed certification in place of the leases or permits for future acquisition applications.
(5) The easement or lease shall include, at a minimum, all of the following rights:
- (a) The right to post signs.
- (b) The right of limited construction.
- (c) The right of maintenance.
- (d) The right of use by snowmobilers and other nonconflicting recreational trail users.
- (6) Cost sharing shall be limited to the minimum land area necessary for the trail.
History: 1982 AACS; 2011 AACS.