- A. The permittee shall minimize the removal of vegetation, topsoil, and overburden before surface mining.
- B. The permittee shall construct and maintain erosion and sediment control devices in accordance with the grading and sediment control plan approved by the local soil conservation district.
- C. The permittee shall confine mining activity to the maximum area of disturbance at any one time as described in the permit.
- D. The permittee shall maintain a valid sediment and erosion control approval, including the necessary renewal by the approving authority, for the life of the permit.
Authority: Environment Article, §§15-803 and 15-813; Natural Resources Article, §10-2A-06(c); Annotated Code of Maryland
Effective date: December 11, 1989 (16:24 Md. R. 2617)
Regulation .23C, E amended effective May 14, 1990 (17:9 Md. R. 1088)
Chapter recodified from COMAR 08.05.10 to COMAR 26.21.01, June 1996
Regulation .03E adopted effective May 14, 2001 (28:9 Md. R. 890)