Md. Code Regs. 26.03.01.06
For each service area, flow data for all community and multi-use sewerage facilities will be presented according to either Table No. 15 for wastewater treatment plants or Table No. 15A for all principal collector sewers, interceptors, pumping stations, and associated force mains. Information presented previously in either Table No. 9 or Table No. 10 can be omitted from Table No. 15. In Table No. 15A, present data according to the flow pattern of existing sewerage system by starting with principal collector sewers and proceed to the treatment plant. —————— —————— —————— * If transfer to public ownership is recommended, indicate expected date. —————— * Based on dollar values as of effective date of plan where applicable. —————— —————— ** If transfer to public ownership is recommended, indicate expected date. —————— —————— —————— * Where applicable for both treatment facility and point of discharge location. ** Based on real dollar values. *** Month and year—for the last 5 years the “Construction Schedule Column” and need not be filled in. Table No. 14
Water and Sewerage Map Symbols * Per Effective Date of Plan (7-1-76) ** During Previous Fiscal Year *** List Residential (R) Separately from Commercial (C) and Industrial(i) BPI—Building Permits Issued Per Effective Date of Plan UC—Building Permits Issued Per Effective Date of Plan for Units under Construction NUC—Building Permits Issued Per Effective Date of Plan for Units not under Construction PWA—Building Permits for Unexpired Public Works Agreements Per Effective Date of Plan
| Table No. 3 Projected Water Supply Demands and Planned Capacity | |||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Service Area | Present 1975 | 1980 | 1990 | 2000 | |||||||||||||||||||||||||
| Population | GPCD | Capacity | Population | GPCD | Capacity | Population | GPCD | Capacity | Population | GPCD | Capacity | ||||||||||||||||||
| total | served | unserved | (gals) | demand | planned | total | served | unserved | (gals) | demand | planned | total | served | unserved | (gals) | demand | planned | total | served | unserved | (gals) | demand | planned | ||||||
| Table No. 4 Inventory of Existing Community System Wells | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Well Name or Number | Aquifer | Coordinate Location | Depth Feet | Diameter Inches | Max. Safe Yield | Pumping Capacity | Water Quality | ||
| Municipal (Public) | |||||||||
| Industrial | |||||||||
| Private Community/ Institutional | |||||||||
| Table No. 5 Inventory of Existing Impounded Supplies | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Owner | Crest Elevation (above sea level) | Spillway Length | Total Length of Dam | Height of Crest Above Stream Bed | Flooded Area of Crest Elevation | Length of Shore Line at Crest Elevation | Water Overflowed Crest for First Time | Capacity of Reservoir | Safe Yield (MGD) | Average Daily Withdrawal (MGD) | |
| Municipal (Public) | |||||||||||
| Industrial | |||||||||||
| Private Community/ Institutional | |||||||||||
| Table No. 6 Inventory of Existing Water Treatment Facilities | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Owner | Water Source | Type Treatment | Plant Coordinate Location | Rated Plant Capacity (MGD) | Average Production (MGD) | Max Peak Flow (MGD) | Storage Capacity (MGD) | Planned Expansion MGD/Dates | Method of Sludge Disposal | Operating Agency | |
| Municipal (Public) | |||||||||||
| Industrial | |||||||||||
| Private Community*/ Institutional | |||||||||||
| Table No. 8 Immediate, 5 and 10 Year Priorities for Water Development | ||||||||
|---|---|---|---|---|---|---|---|---|
| Estimated Costs* | Project Status Constr. Start | |||||||
| Fiscal Year and Project Number | County Priority Assigned | Coordinate Location | Description | Total | Federal and/or State | Local | Immediate Priority Projects | 5 and 10 Year Period Projects |
| ______Year | ||||||||
| Table No. 9 Projected Sewerage Demands and Planned Capacity | |||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Service Area | Present 1975 | 1980 | 1990 | 2000 | |||||||||||||||||||||
| Population | GPCD | Capacity | Population | GPCD | Capacity | Population | GPCD | Capacity | Population | GPCD | Capacity | ||||||||||||||
| total | served | unserved | (gals) | demand | planned | total | served | unserved | (gals) | demand | planned | total | served | unserved | (gals) | demand | planned | total | served | unserved | (gals) | demand | planned | ||
| Table No. 10 Inventory of Existing Water Treatment Facilities | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Owner | Type Treatment | Plant Coordinate Location | Occupied Acres | Vacant Acres | Point of Discharge* | Max Site Capacity Secondary | Max. Site Capacity (MGD) Advanced | Existing (MGD) Capacity | Flows (MGD) Average Peak | Planned or Expected Abandonment Date of Interim MGD Date | Operating Agency | |
| Municipal (Public) | ||||||||||||
| Industrial | ||||||||||||
| Private Community**/ Institutional | ||||||||||||
| Table No. 11 Problem Areas Inventory — Individual and Community | |||||||
|---|---|---|---|---|---|---|---|
| Service Area | Problem Description | Location | Population | Acres | Treatment Capacity | Treatment Demand | Planned Correction Date if Known |
| Table No. 12 Water Quality Problem Due to Storm Drainage Outfalls and to Non-point Sources | |||
|---|---|---|---|
| Service Area | Problem Description | Location | Reach Affected |
| Table No. 13 Immediate 5 and 10 Year Priorities for Sewerage Development | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Costs** | Projected Schedule*** | ||||||||
| Fiscal Year and Project Number | County Priority Assigned | Coordinate* Location | Description Total | PL 660 Eligibility | Other Federal Local | Preliminary Plans | Financial Plans | Start Construction | Complete Construction |
| _____Year | |||||||||
| _____Year | |||||||||
| Table No. 15 Flow Data Wastewater Treatment Plants | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Design Parameters | Flow | Development Occupancy Units (1) | |||||||
| Name or Service Area | Hydraulic (mgd) | Organic (ppm) | Avg. Day* (mgd) | Max. Day & (Date**) | Existing* | Anticipated*** BPI | PWA | ||
| BOD | SS | UC | NUC | ||||||
| Example: | 117 R | 7 R | 830 R | ||||||
| Clear Water | 3.5 | 200 | 200 | 3.0 | 5.5(3-17-76) | 6,500 | 7 C | none | none |
——————
| Table No. 15A Flow Data Collector Sewers, Inceptors, Pumping Stations and Force Mains | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Name or Sewer Type Designation | Sewer | Capability Pumping Station | Force Main | |||||||
| Diam. (Inches) | Flow, Avg. Day* | mgd Design | Number of Pumps | Capacity of Each Pump (mgd) | Normal Pumping Capacity (mgd) | Avg. Day Pumpage* (mgd) | Max. Day Pumpage and Mgd (date)** | Diam. (inches) | Design FLow (mgd) | |
| Example: Collector | 12 | 0.5 | 1.0 | |||||||
| Clear Branch Interceptor | 18 | 3.5 | 5.0 | |||||||
| Severn Run P.S. and | 2 | 3.6 | 3.6 | 2.5 | 3.0 (3-1-76) | |||||
| F.M. | 24 | 8.0 | ||||||||
| Clear Water STP | (See Table No. 15) | |||||||||
* Per Effective Date of Plan (7-1-76)
** During Previous Fiscal Year
Authority: Environment Article, §§9-218, 9-505, 9-506, and 9-510, Annotated Code of Maryland
Effective date: July 1, 1975 (2:3 Md. R. 154)
Regulations .02A, .03A, .04E, F, .05, .06 amended effective Dec. 24, 1975 (2:29 Md. R. 1735)
Regulation .07 adopted effective January 26, 1987 (14:2 Md. R. 129)
Chapter recodified from COMAR 10.17.01 to COMAR 26.03.01
Regulation .01 amended effective July 25, 1988 (15:15 Md. R. 1813)
Regulation .08 adopted effective July 25, 1988 (15:15 Md. R. 1813)