- A. An employer shall ensure that prior to the erection or modification of any tower crane or supporting structure, a qualified person shall determine the appropriate and safe method to integrate, assemble, and erect the tower crane for that site.
B. The employer shall ensure that when a tower crane is erected, dismantled, jumped, or reconfigured the following are maintained at the site where the work is performed:
- (1) Written instructions by the manufacturer or a qualified person; and
- (2) A list of the weights of each subassembly to be erected, dismantled, jumped, or reconfigured.
- C. Except when approved and documented by a qualified person, prior to the commencement of work on the tower crane, the employer shall establish procedures for the particular site for the erection, dismantling, jumping, or reconfiguration work.
- D. An employer shall ensure that rigging operations during the erection, dismantling, jumping, or reconfiguring of a tower crane is performed under the direct supervision of a master/lead rigger.
E. An employer shall ensure that a daily job safety briefing is conducted before the commencement of work with all persons working on or around the crane in the following circumstances:
- (1) Prior to each jumping operation;
- (2) Prior to when the boom, jib, or counter-jib is to be reconfigured; or
- (3) Prior to when a tower crane is to be dismantled.
F. An employer shall ensure that the master/lead rigger discuss the following at the daily job safety briefing:
- (1) The site-specific procedures;
- (2) The manufacturer's recommendations and precautions;
- (3) Any concerns related to the process that is to be undertaken;
- (4) The communication methods and procedures to be used; and
- (5) The process workload for the work shift, including the individual tasks to be performed by each person.
- G. An employer shall ensure that erection, dismantling, and inspections shall be conducted in accordance with Chapters 3-1 and 3-2 of the ASME B30.3-2004 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings — Construction Tower Cranes.
Authority: Labor and Employment Article, §§2-106(b)(4), 5-104, and 5-312, Annotated Code of Maryland
Effective date: April 6, 2009 (36:7 Md. R. 522)
Regulation .03B amended effective December 28, 2009 (36:26 Md. R. 1994)
Regulation .04B amended effective December 28, 2009 (36:26 Md. R. 1994)
Regulation .06B amended effective December 28, 2009 (36:26 Md. R. 1994)
Regulation .08 amended effective December 28, 2009 (36:26 Md. R. 1994)
Regulation .09 amended effective December 28, 2009 (36:26 Md. R. 1994)
Regulation .12B amended effective December 28, 2009 (36:26 Md. R. 1994)
Chapter revised effective June 27, 2011 (38:13 Md. R. 754)
Regulation .04B amended effective November 24, 2016 (43:23 Md. R. 1279)
Regulation .10A amended effective November 24, 2016 (43:23 Md. R. 1279)
Regulation .11D amended effective November 24, 2016 (43:23 Md. R. 1279)