Eligibility
Effective Mar 23, 2018Mass. Register #1361MGL c. 21J MGL c. 148, § 37(A) and (B)Massachusetts Department of Revenue
- (1) Only those applicants defined as Eligible Parties in 503 CMR 3.02 are eligible for a grant under 503 CMR 3.00.
- (2) Double Walled Underground Storage Tank(s) that have been installed with leak detection and spill containment and overfill protection in accordance with 527 CMR: Board of Fire Prevention Regulations are not eligible for a grant.
- (3) The application described in 503 CMR 3.06 shall be in the form prescribed by the Board.
- (4) Underground fuel storage tanks located at marine facilities must have a permit from the State Fire Marshal in accordance with 527 CMR: Board of Fire Prevention Regulations. Consumptive use heating oil tanks must have a permit from the local fire department in accordance with 527 CMR.
- (5) Applicants removing or closing a UST must file and update the UST registration information with MassDEP.
- (6) Grants awarded under this program shall not exceed 50% of eligible costs.
- (7) Applicants removing a fuel storage tank and replacing it with an above-ground storage tank must provide documentation demonstrating that the selected replacement is equal to or less costly than replacement with a new underground fuel storage tank exclusive of environmental concerns. The maximum amount of eligible costs will be the cost of removal and replacement with an underground fuel storage tank.
- (8) Only eligible costs, as defined by the Board, will be reimbursed. To be eligible, costs must be directly related to the Closure, removal and/or replacement of the Fuel Storage Tank(s) System. Applicants applying for a grant to cover projects with some eligible and some ineligible costs must provide an estimate of eligible costs based on a methodology acceptable to the Board. Acceptable methodologies for determining eligible costs may include: a detailed breakdown of cost elements on the contractor's invoice; an independent estimate of the cost for the eligible portions of the project; or the cost of a similar, fully eligible project.