310 C.M.R. 19.206

Construction and Demolition (C&D) Waste Processing Facilities Requirements

Effective Jul 8, 2022Mass. Register #1473MGL c. 21A, §§ 2 and 8 MGL c. 111, § 150AMassachusetts Department of Environmental Protection
  1. (1) All handling (unloading, storage, crushing, shredding, chipping, sorting, etc.) of C&D waste shall occur indoors unless otherwise approved by the Department.
  2. (2) All processed C&D waste and recovered or recyclable materials shall be stored in a manner appropriate for that material to protect the public health, safety and the environment. In general all processed C&D wastes (i.e. C&D fires), but not necessarily recovered or recyclable materials, shall be stored in covered containers or in covered piles on impervious surfaces.
  3. (3) All storm water, or water used for site operations, that comes in contact with C&D materials and recovered or recyclable materials shall be controlled and collected and otherwise properly managed in accordance with all applicable local, state and federal requirements prior to discharge offsite.
Log InSign Up