- A. The permittee shall plan the location and number of insertion pits and submit the plans in writing for the department’s approval prior to excavation.
- B. The insertion pits shall be located so that their total number is minimized and the length of replacement pipe installed in a single pull is maximized.
- C. Repairs under the roadway are prohibited if they necessitates open cutting the roadway. If the permittee experiences difficulty with the crossing, the permittee shall install a new pipe crossing at his sole expense.
Authority Note
AUTHORITY NOTE: Promulgated in accordance with R.S. 48:381, et seq.
Historical Note
HISTORICAL NOTE: Promulgated by the Department of Transportation and Development, Office of Highways/Engineering, LR 31:107 (January 2005), amended by the Department of Transportation and Development, Office of General Counsel, LR 51:1886 (November 2025).