A. The manufacturer shall maintain, at each site of manufacture of industrialized buildings, a quality control manual. The manufacturer’s quality control manual shall at a minimum contain the following information.
1. Organizational Element
- a. Introduction of the Manufacturer. A brief history which shall, at a minimum, include the length of time that the manufacturer has been in the industrialized buildings industry, where it is incorporated, whether it is a division of any parent organization, the identity of products it manufactures, and the location of the facility.
- b. Identification of principals and the positions of partners if the manufacturer is a partnership or its officers, directors, controlling owners and registered agent if the manufacturer is a corporation.
- c. An organizational chart showing responsible management and supervisory positions by title. A job description for each of the positions shall be provided.
- d. Brief qualifications of all personnel in management and supervisory positions including the quality control manager.
- e. Administrative procedure for revision of quality control procedure and quality control manual.
- f. Procedure for retaining permanent records of plans, travelers, inspection reports, serial numbers of buildings, decals used, first destination of labeled buildings or components.
- g. Method and frequency for training of quality control and production personnel.
2. Design and specification control:
- a. procedures for revisions to plans;
- b. recording system of drawings and specifications.
3. Material control:
- a. inspection procedure of materials, equipment and supplies when received;
- b. method of storing and protection of building materials and equipment against damage;
- c. provision for disposal of rejected materials, equipment and supplies;
- d. forms used.
4. Production control:
- a. a description of manufacturing process—method and sequence of construction;
- b. check lists of material specifications and workmanship inspections performed at each stage of production by supervisors, corrective actions taken, use of traveler;
- c. frequency of quality control inspections;
- d. list of tests to be performed, testing equipment, results and technical data acceptable;
- e. procedures for timely preventive and remedial measures;
- f. assignment of authority to accept or reject work;
- g. provision for disposition of rejected items;
- h. forms used.
5. Finished product control and identification of products:
- a. procedure for handling and storage of finished buildings/modules and components;
- b. preparation for shipping, transportation, and delivery;
- c. serial numbering system of buildings or components and location of the serial number not readily removable;
- d. location of manufacturer’s data plate. Information to contain in the data plate;
- e. location of Louisiana state decal;
- f. forms used.
- 6. A copy of the initial plant certification report in accordance with §2735 herein.
Authority Note
AUTHORITY NOTE: Promulgated in accordance with R.S. 40:1730.51 through 1730.66.
Historical Note
HISTORICAL NOTE: Promulgated by the Department of Public Safety and Corrections, Office of State Fire Marshal Code Enforcement and Building Safety, LR 35:2473 (November 2009), amended LR 36:1025 (May 2010).