A. Complete, detailed technical specifications for those applicable sanitary components shall be supplied for the proposed project, including:
- 1. a program for keeping existing water supply facilities in operation during construction of additional facilities so as to minimize interruption of service;
- 2. laboratory facilities and equipment, including the capacity to perform laboratory analyses of required tests;
- 3. the number and design of chemical feeding equipment (see §201 and §203 of this Part);
- 4. procedures for flushing, disinfection and testing, as needed, prior to placing the project in service;
- 5. materials or proprietary equipment for sanitary or other facilities including any necessary backflow or back-siphonage protection.
Authority Note
AUTHORITY NOTE: Promulgated in accordance with the provisions of R.S. 40:4(A)(8), 40:4.13.D.(1)(2) and 40:5(A)(2)(3)(5)(6)(7)(17).
Historical Note
HISTORICAL NOTE: Promulgated by the Department of Health, Office of Public Health, LR 44:300 (February 2018), effective August 1, 2018.