Kan. Admin. Regs. § 5-45-11
(a) Levees not within a floodway designated by the chief engineer are required to have the following freeboard:
| Design flood frequency | Freeboard required |
| 10 years | 1 foot |
| 25 years | 2 feet |
| 50 years or more | 3 feet |
(Authorized by and implementing K.S.A. 24-126; effective May 1, 1987.)