Learn More
Log In
Sign Up
Design of Earth Dams | Midpage
Collections
Kansas Administrative Regulations
5
Article 40
Design of Earth Dams
Kansas Department of Agriculture—Division of Water Resources
5-40-1
Definitions.
5-40-2
Dams; plans and specifications.
5-40-2a
Benchmarks.
5-40-2b
Design reports.
5-40-3
Specifications.
5-40-4
Preparer of maps, plans, profiles, reports, and specifications.
5-40-5
Determining the capacity of a reservoir.
5-40-5a
Determining the height of a dam or barrier.
5-40-6
Waiver and stricter requirements.
5-40-7
Other maps, plans, profiles, data and specifications.
5-40-8
Acceptable application.
5-40-12
As-built drawings.
5-40-14
Testing a principal spillway pipe installation in a dam; applicability.
5-40-15
Testing a principal spillway pipe installation in a dam; general procedures.
5-40-16
Testing a principal spillway pipe installation in a dam; allowable leakage rate, test methods.
5-40-20
Hazard classes of dams.
5-40-21
Class sizes of dams.
5-40-22
Design requirements for construction of a dam.
5-40-23
Detention storage.
5-40-24
Dam breach analysis.
5-40-26
Request to issue or reconsider hazard class determination.
5-40-30
Time of concentration.
5-40-31
Design duration rainfall depth.
5-40-32
Determination of rainfall excess.
5-40-33
Hydrographs.
5-40-40
Geotechnical investigation of all dams.
5-40-41
Geotechnical investigation of a low-impact dam.
5-40-42
Geotechnical investigation of a high-impact dam.
5-40-43
Cutoff trench.
5-40-44
Embankment.
5-40-45
Allowance for settlement of an earthen dam.
5-40-46
Side slopes of an earthen dam.
5-40-50
Pipes.
5-40-51
Acceptable trash racks for primary spillways.
5-40-52
Stilling basins.
5-40-53
Drawdown pipes.
5-40-54
Control of seepage along a conduit.
5-40-55
Earthen auxiliary spillways.
5-40-56
Maximum design velocity for an auxiliary spillway.
5-40-57
Service spillway design.
5-40-70
Construction notification to the chief engineer.
5-40-71
Inspection during dam construction, repair, and modification.
5-40-72
Construction inspection reports.
5-40-73
Emergency action plan.
5-40-73a
Discovery of an existing illegal, unpermitted dam.
5-40-74
Design criteria for an existing illegal, unpermitted dam.
5-40-75
Maintenance of dams.
5-40-76
Repair or modification of a permitted or prejurisdictional dam.
5-40-77
Easements for dams.
5-40-90
Requirements for a dam safety inspection report.
5-40-91
Schedule for inspection of hazard class C dams.
5-40-92
Schedule for inspection of hazard class B dams.
5-40-93
Schedule for inspection of dams.
5-40-94
Revision of schedule of inspections.
5-40-100
Request to be included on the list of independent engineers qualified to review applications.
5-40-101
Information to be submitted with a request to be a reviewer.
5-40-102
Minimum requirements to be an individual reviewer.
5-40-103
Conflict of interest.
5-40-104
Notification of approval or disapproval to be a reviewer.
5-40-105
Procedure for independent review of an application to construct a dam or other water obstruction.
5-40-106
Report of findings of independent reviewer.