Kan. Admin. Regs. § 28-29-1606
Before land-spreading may occur, each operator that plans to land-spread shall perform the following for each cell, as identified on the cell identification map, on which drilling waste will be land-spread:
(b) based on the chloride concentrations of the drilling waste and chloride concentrations of the soil in the cell, determine the maximum land-spreading rate according to the following requirements:
(2) the land-spreading rate shall ensure that, after land-spreading, both of the following requirements are met:
(Authorized by and implementing K.S.A. 2012 Supp. 65-3407c; effective Oct. 11, 2013.)