Kan. Admin. Regs. § 28-19-82
Impact Monitoring Fee= G.M.× C.M.y T.G.M.y + G.Q.R.× C.Q.R.y T.G.Q.R.y
When using the formula, the following values shall be used:
1. G.M. = the generating design capacity for that particular facility which is monitored with sampling equipment operated by the department of health and environment;
2. T.G.M.y = the sum of the generating design capacities for all facilities in the state powered by the same type of fuel that are monitored with identical sampling equipment operated by the department of health and environment during the same 12 month period;
3. C.M.y = the sum of all of the costs of the department of health and environment during the same 12 month period for operating identical sampling equipment at each power generation facility powered by the same type of fuel;
4. G.Q.R. = the generating design capacity for that particular facility where monitoring activities conducted by the owner or operator are subject to quality review and evaluation by the department of health and environment;
5. T.G.Q.R.y = the sum of the generating design capacities for all facilities in the state powered by the same type of fuel where monitoring activities conducted by the owner or operator are subject to identical quality review and evaluation by the department of health and environment during the same 12 month period; and
6. C.Q.R.y = the sum of the costs of the department of health and environment during the same 12 month period for providing identical quality review and evaluation of monitoring activities conducted by the owner or operator at each power generation facility powered by the same type of fuel.
(Authorized by and implementing K.S.A. 65-3022; effective, T-82-11, June 9, 1982; effective May 1, 1983.)