- (a) Each permit applicant shall submit with the construction plans and specifications hydrogeologic information, soil testing data, and design calculations documenting that the proposed use of in situ soils or a constructed soil liner is capable of meeting the required maximum soil liner seepage rate.
- (b) Whether in situ soils or a constructed soil liner is utilized for the wastewater lagoon, a minimum of one foot of natural soil or one foot of constructed liner shall be provided.
(Authorized by K.S.A. 2003 Supp. 65-171d; implementing K.S.A. 65-164, 65-165, 65-166, and K.S.A. 2003 Supp. 65-171d; effective May 20, 2005.)