(a) Each restoration plan shall consist of the following:
- (1) Restoration scope;
- (2) design plans and specifications;
- (3) watershed protection plan, if applicable;
- (4) cost estimates;
- (5) project schedule; and
- (6) any other relevant documents that pertain to renovation, protection, or restoration of the water supply structure, as determined by the commission.
- (b) Each modification of the original restoration plan shall require the prior notification and approval of the commission.
(Authorized by and implementing K.S.A. 2007 Supp. 82a-2101; effective Nov. 14, 2008.)