Ind. Admin. Code tit. 675, r. 15-1.6-3
Authority: IC 22-12-6-1; IC 22-13-2-2; IC 22-13-2-13; IC 22-13-4-2
Affected: IC 22-12; IC 22-13; IC 22-15
Sec. 3. (a) In accordance with 675 IAC 15-1.2-3, it shall be unlawful for production of an industrialized building system or mobile structure to begin without first obtaining a construction design release.
(b) The following fees are applicable if production is started before the issuance of a design release:
(1) System plan review, including structural/typical systems:
| (A) filing fee | $60 | |
| (B) residential, add-a-room, or duplex | $6403 | |
| (C) commercial | $1,0103,4 |
(2) Addenda, including structural/typical systems:
| (A) filing fee | $60 | |
| (B) residential, add-a-room, or duplex | $1703 | |
| (C) commercial | $210 3,4 |
Notes: 3Includes only the original floor plan. A one hundred dollar ($100) fee is charged for each additional floor plan. Crawlspace or basement plans are considered a floor plan. 4Includes two (2) units as a completed structure. A one hundred dollar ($100) fee is charged for each additional module unit.
(Fire Prevention and Building Safety Commission; 675 IAC 15-1.6-3; filed Aug 18, 2005, 4:30 p.m.: 29 IR 27; readopted filed Aug 4, 2011, 8:35 a.m.: 20110831-IR-675110254RFA; readopted filed Mar 10, 2017, 9:37 a.m.: 20170405-IR-675170005RFA; readopted filed May 11, 2023, 2:22 p.m.: 20230607-IR-675230104RFA)