Ind. Admin. Code tit. 675, r. 15-1.2-3
Authority: IC 22-13-2-2; IC 22-13-2-13; IC 22-13-4-2; IC 22-15-3-2
Sec. 3. (a) An application for a design release for an industrialized building system or mobile structure, including an application for a modification of a system plan governed by an existing design release, shall be submitted to the office of the state building commissioner.
(b) The application shall be submitted by:
on behalf of the manufacturer.
(c) The applicant shall use the forms and format specified by the office of the state building commissioner for the application. All plans, specifications, and other supporting documentation must also be submitted in the format specified by the office of the state building commissioner.
(d) The following information shall be included on the application:
(e) A quality control manual shall be submitted as required in section 15 of this rule. Submission of this quality control manual is not required if it has been previously submitted and released by the office of the state building commissioner and the quality control manual is not being revised.
(f) Plans and specifications accompanying the application shall be submitted as required in section 5 of this rule.
(g) The fee required by 675 IAC 15-1.6 shall be submitted with the application.
(Fire Prevention and Building Safety Commission; 675 IAC 15-1.2-3; filed Aug 18, 2005, 4:30 p.m.: 29 IR 15; readopted filed Aug 4, 2011, 8:35 a.m.: 20110831-IR-675110254RFA; readopted filed Mar 10, 2017, 9:37 a.m.: 20170405-IR-675170005RFA; readopted filed May 11, 2023, 2:22 p.m.: 20230607-IR-675230104RFA)