Authority: IC 22-13-2-13
Affected: IC 22-15-3
Sec. 5. (a) A city, town, or county certified to perform plan review of Class 1 structures shall adhere to the following procedures:
- (1) Plans and specifications shall be checked for compliance with 675 IAC 12-6, Design Releases.
- (2) A report of errors and omissions shall be prepared for each construction project covered by submitted plans and specifications.
- (3) The report of errors and omissions shall include a citation reference to the exact section of a rule of the commission for each error or omission noted by the plan reviewer.
- (4) Upon preparation, the report of errors and omissions shall be mailed directly to the division on the same working day. A copy may be furnished to the applicant for the design release.
- (5) The local qualified plan reviewer shall stamp each set of submitted plans and specifications with a seal provided by the division.
- (6) The local plan reviewer will affix his or her signature over the seal to identify those sets to be subsequently submitted to the division in accordance with 675 IAC 12-6.
- (7) The stamped set of plans and specifications shall be returned to the applicant with an instruction to submit them, with a completed application for construction design release, to the division in accordance with 675 IAC 12-6.
(b) The seal provided by the division shall remain the property of the division.
(c) The certified city, town, or county may obtain a supply of application for construction document release forms from the division for the convenience of plan review applicants.
(Fire Prevention and Building Safety Commission; 675 IAC 12-7-5; filed Feb 1, 1988, 2:15 p.m.: 11 IR 1788; filed Jan 30, 1998, 4:00 p.m.: 21 IR 2101; readopted filed Sep 11, 2001, 2:49 p.m.: 25 IR 530; filed Aug 30, 2006, 2:25 p.m.: 20060927-IR-675050108FRA; readopted filed Aug 8, 2012, 8:08 a.m.: 20120905-IR-675120260RFA; readopted filed Jul 3, 2018, 2:22 p.m.: 20180801-IR-675180204RFA; readopted filed Jun 10, 2024, 8:09 a.m.: 20240710-IR- 675230794RFA)