Ind. Admin. Code tit. 675, r. 12-3-2
Authority: IC 22-12-6-6
Affected: IC 22-15-3-2
Sec. 2. (a) Every application for construction design release (ACDR) required by 675 IAC 12-6 shall be accompanied by payment to the fire and building services fund in an amount prescribed in this section.
(b) The design release fees shall be as follows: *The minimum processing fee only applies where the categorical processing fee is less than $75.
| All Projects | Amount | ||
|---|---|---|---|
| Filing Fee | $75 | ||
| plus | |||
| Processing Fee | $75 minimum* | ||
| TOTAL | $150 minimum* |
(c) The categorical processing fees shall be as follows:
(d) The special processing fees shall be as follows:
| Special Processing Fees | Amount | ||
|---|---|---|---|
| (1) | Each additional submission for a partially filed project | $250 | |
| (2) | Surcharge for late filing of plans and specifications in accordance with 675 IAC 12-6-8(c)2 | $300 | |
| (3) | Foundation release | $80 | |
| (4) | Addenda and revisions, each system modified per submission (other than compliance corrections)3 | $35 | |
| (5) | Master plans each series or structure | $173 | |
| (6) | Incomplete project filing (mailed submissions only)4 | $12 | |
| (7) | Returned checks | $35 | |
| (8) | Reinstatement or time extension of design release | $50 | |
| Notes: | |||
| 1The regular filing and processing fees are paid with the initial submission of the ACDR. | |||
| 2The surcharge fee, if not collected at the time the ACDR is filed, shall be paid before issuance of any design release. | |||
| 3Systems are architectural, structural, electrical, plumbing, mechanical (HVAC), fire alarm, and fire suppression. | |||
| 4Payable when missing documents are subsequently filed. | |||
| 5"Shell building" means a Class 1 structure for which a design release is required before further construction is performed to accommodate the occupancy of one (1) or more initial tenants. | |||
(e) The explanation of terms shall be as follows:
(1) Square footage (floor area) shall be determined by the outside dimensions of the building or structure. This shall include usable area under the horizontal projection of the roof or floor above such as the following:
(3) Costs (construction) shall be the cost of the labor and materials required to perform the stated scope of construction. It need not include the cost of the following:
(f) The state fire marshal or the building law compliance officer may authorize the refunding of any fee specified in this section that was paid or collected in error.
(Fire Prevention and Building Safety Commission; 675 IAC 12-3-2; filed Jan 29, 1986, 3:00 p.m.: 9 IR 1363, eff Mar 1, 1986; filed Feb 17, 1987, 3:15 p.m.: 10 IR 1386, eff Mar 1, 1987 [ IC 4-22-2-36 suspends the effectiveness of a rule document for 30 days after filing with the Secretary of State. LSA Document #86-152 was filed Feb 17, 1987.]; filed Jul 17, 1987, 2:45 p.m.: 10 IR 2700, eff Aug 1, 1987 [ IC 4-22-2-36 suspends the effectiveness of a rule document for 30 days after filing with the Secretary of State. LSA Document #87-54 was filed Jul 17, 1987.]; filed Jun 3, 1988, 2:15 p.m.: 11 IR 3555, eff Aug 1, 1988; filed Sep 27, 1989, 4:30 p.m.: 13 IR 294; filed Apr 22, 1996, 3:00 p.m.: 19 IR 2285; readopted filed Sep 11, 2001, 2:49 p.m.: 25 IR 530; filed Apr 16, 2002, 9:05 a.m.: 25 IR 2731; filed Aug 30, 2006, 2:25 p.m.: 20060927-IR-675050108FRA; readopted filed Aug 8, 2012, 8:08 a.m.: 20120905-IR- 675120260RFA; readopted filed Jul 3, 2018, 2:22 p.m.: 20180801-IR-675180204RFA; filed Feb 9, 2022, 4:29 p.m.: 20220309-IR-675210461FRA; readopted filed Jun 10, 2024, 8:09 a.m.: 20240710-IR-675230794RFA)